URSY.ARTPART OF THE URSY NETWORKSign inExplore
Skip to content
← Back to the collection
In the museum catalogue

An image is not available here yet.

View at the museum ↗
Art Institute of Chicago

Boiler House Assembly Plant Under Construction, Berlin Municipal Electricity Works, Power Plant West (Kesselhaussttutzen (Montegeanlage BEWAG, Berlin, Kraftwerk West)

Carl Grossberg

1929

Attribution
Carl Grossberg German, 1894-1940
Medium
Graphite on tan wove paper
Physical dimensions
48 × 38 cm (18 15/16 × 15 in.)
Credit line
Margaret Day Blake Fund
CATALOGUE RECORD

Museum metadata is available under CC0. Image availability and rights are separate; consult the source record.

Source rights statement: Public-domain image eligibility not established by this export

View the museum record ↗
Open collection · 706,931 works · Museum sources. Visible evidence. CONNECTED
A DIFFERENT WAY TO DISCOVER

Follow your inspiration.

Find art with a description, a reference image, or a selected crop.

Private searches run on our local image worker. Inputs expire after one hour and are never added to the public collection.